Construction Safety Manager- Data Center Construction Job at Strategic Direct Solutions, LLC, Santa Teresa, NM

  • Strategic Direct Solutions, LLC
  • Santa Teresa, NM

Job Description

Job Description

Job Description

Job Type: Full-Time / Temporary Contract (Long-Term Project)

Project Duration: This is a temporary, project-based position with an anticipated duration of at least 12 months. Depending on project timelines, workload, and client needs, assignments may be extended for an additional 1–2 years, with the potential for projects to span 2–3 years total.

Job Overview

Strategic Direct Solutions (SDS) is seeking experienced Construction Safety Managers to support multiple large-scale data center construction projects across the United States. This position will be responsible for overseeing daily jobsite safety operations, ensuring compliance with OSHA regulations, implementing safety procedures, and promoting a safe working environment for all personnel.

Ideal candidates will have a strong background in commercial or industrial construction safety, preferably within data centers, electrical infrastructure, or large-scale construction projects.

Key Responsibilities

  • Oversee and enforce all jobsite safety policies, procedures, and OSHA regulations.
  • Conduct daily safety inspections, site walkthroughs, and hazard assessments.
  • Lead daily toolbox talks, safety meetings, and new-hire safety orientations.
  • Monitor construction activities involving electrical installations, overhead infrastructure, material handling, aerial lifts, and power distribution systems.
  • Identify potential safety hazards and implement corrective actions to prevent incidents.
  • Ensure proper use of PPE, fall protection, and safe work practices.
  • Review Job Hazard Analyses (JHAs), Job Safety Analyses (JSAs), and other required safety documentation.
  • Investigate workplace incidents, near misses, and safety concerns, providing detailed reports and corrective action recommendations.
  • Maintain accurate safety records, inspection reports, and compliance documentation.
  • Coordinate with project managers, site supervisors, subcontractors, and client safety representatives to maintain a safe and compliant work environment.
  • Monitor compliance with Lockout/Tagout (LOTO), electrical safety, ladder safety, and equipment operation procedures.

Qualifications & Requirements

  • Previous experience in construction safety management or site safety supervision.
  • Experience working on large-scale commercial, industrial, electrical, or data center construction projects preferred.
  • Strong knowledge of OSHA construction standards (29 CFR 1926).
  • OSHA 30 Construction certification required.
  • CHST, CSP, OSHA 510, or OSHA 500 certifications strongly preferred.
  • Familiarity with electrical safety standards, including NFPA 70E, is a plus.
  • Experience conducting safety inspections, incident investigations, and safety training.
  • Strong communication, organizational, and leadership skills.
  • Ability to work independently in a fast-paced construction environment.
  • Proficiency in maintaining safety documentation and reporting.
  • Must be comfortable working on active construction sites and coordinating with multiple trades.

Additional Information

SDS is staffing Safety Manager positions across multiple ongoing and upcoming data center construction projects nationwide. Project locations, schedules, compensation, and assignment durations will vary depending on site requirements.

Apply Today

Qualified candidates are encouraged to submit an updated resume highlighting relevant construction safety experience, certifications, and previous project involvement.

Strategic Direct Solutions (SDS)
Supporting Critical Infrastructure & Data Center Construction Nationwide

\nCompany Description

OUR VALUES

· Acting Like an Owner

· Assuming Positive intent in all employee interactions

· Being passionate about your work

· Challenging yourself in personal development

· Being tireless in exceeding customer expectations

· Assisting others to be successful as a team

· Owning our own mistakes quickly

· Talking with people and NOT about them

Company Description

OUR VALUES\r\n\r\n· Acting Like an Owner\r\n\r\n· Assuming Positive intent in all employee interactions\r\n\r\n· Being passionate about your work\r\n\r\n· Challenging yourself in personal development\r\n\r\n· Being tireless in exceeding customer expectations\r\n\r\n· Assisting others to be successful as a team\r\n\r\n· Owning our own mistakes quickly\r\n\r\n· Talking with people and NOT about them

Job Tags

Full time, Temporary work, For subcontractor

Similar Jobs

Alpine Specialty Services

Entry Level Carpet Cleaner Job at Alpine Specialty Services

 ...industry leaders.Why Choose Alpine?At Alpine, we don't just hire employees-we build careers. Through top-tier training,...  ...coaching, setting you up for success from day one.Now Hiring: Carpet Cleaner - No Experience Required!We're searching for a motivated Carpet Cleaner... 

American International Group (AIG)

Lead Mobility Engineering SME Job at American International Group (AIG)

At AIG, we are reimagining the way we help customers to manage risk. Join us as a Lead Mobility Engineering SME to play your part in that transformation. Its an opportunity to grow your skills and experience as a valued member of the team.Make your mark in Information... 

Silver Creek Physical Therapy

Physical Therapist Job at Silver Creek Physical Therapy

 ...Salary: $100,000 - $110,000 annually depending on experience Silver Creek Physical Therapy, a member of Therapy Partners Group, has been the premier provider for outpatient orthopedics serving San Jose and surrounding communities for over 20 years. We are seeking... 

Lowes

Sales Specialist - Flooring - Day - (Starting at $21hr) (Bilingual encouraged)-Greenland,New Hampsh Job at Lowes

 ...Job Description Your Impact at Lowe's \n \n \nAs a Sales Specialist, you will be one of the first people our customers meet. Your...  ..., based on hiring needs and skillsets: Appliances, Cabinets, Flooring, Live Nursery, Millwork, Fashion Plumbing, Outlet, Tool Rental,... 

ATL Medical, Inc.

Global Supply Chain Director Job at ATL Medical, Inc.

## Global Supply Chain DirectorApply: ATL Remote Minnesota: Full time: Posted Yesterday: JR100318The Global Supply Chain Director will be responsible for overseeing and managing ATLs comprehensive, international supply chain operations. This position requires a strategic...